Home
Jets
Introduction
Jet Pump General Info
Introduction toJet Versatility
Principle of Operation
Model Selection Guide
Pumping Liquid swith Liquid
Pumping Liquids with Steam
Pumping Gases with Steam/Gas
Pumping Gases with Liquid
Heating Liquids In-Tank
Heating Liquids In-Line
Mixing Liquids
Transporting Solids
Problems/Solutions Using Jets
Eductor Application Form
OnLine Jet Sizing Application
Gages & Gagecocks
Introduction
Armored Flat Glass Gages
Glass Information
Low/Medium/High Pressure Flat Glass Gages
Large Chamber, Weld Pad & Ultra High Flat Glass Gages
Steam/Water Flat Glass Gages
Offshore Gage Glasses
Gagecocks
Series 100, 200, 300 & 400
Series 500, 700, 550, 750 & 600
Tubular Glass Gages
Series N2, K2, K3 & N6 & N7
Magnetic Liquid Level Gages
Introduction
Introduction
Magnetic Gage General Info
Follower/Flag Style Indicators
Point Level Control Measurement
Continuous Level Measurement
Top Mount & Mini
Options & Accessories
Magnetic Gage Application Form
Sight Flow Indicators & Sight Windows
Introduction
ANSI
Dual-Window
Lined
Full-View
Threaded Window Indicators
Angled
Threaded Sight Windows
Indicator and Window Accessories
Boiler Trim Products
Introduction
Series 1A
Series 2A
Series 4A
Series 12A
Series 12B
Water Columns
Steam/Water Flat Glass Gages
Literature
Contact Us/
Locate Distributor

News
FAQ
Distributor Login
Tyco Flow Control


Search

Tyco Valves & Controls
121 W. 1st St
Suite 200
Geneseo, IL 61254
PH: 309-946-5205
FAX: 309-946-5206 eMail: Click Here

 

Selection Guide

To size which Model GST would be the most efficient for your dry solids transport application, the following information is required. Once you have determined this information, simply contact your local Penberthy sales representative or the factory who will help to size and specify the Model GST unit to fit your needs.

Solids Information:

  • Density (Weight of material)
  • Geometry (Shape and size)
  • Amount of Material To Be Moved
  • Required Time to Move This Amount

Operating Air (Gas) Information:

  • Amount of Pressure and Flow Available

Discharge Piping Information:

  • Material of Construction
  • Size & Schedule
  • Total Length Involved
  • Number of Bends/Elbows
  • Vertical Lift
  • Other Restrictions to Consider (e.g., Filter Elements)
  Tyco Flow Control Copyright © 2012 Tyco Flow Control. All rights reserved.